- Home
- Energy Efficiency
- EV charge points
EV charge points.
Power under control.
We install EV charge points for businesses, fleets, car parks and residential communities. We size the power according to the number of vehicles and how long they remain parked, with dynamic load balancing, OCPP management and remote monitoring.
We leave the electrical infrastructure ready to add new chargers without redoing the installation when demand grows.
AC+DC
POTENCIA GESTIONADA
CONTROL REMOTO
ESCALABLE
How many charge points does your car park need?
The minimum provision depends on the type of building, the number of parking spaces and whether it is an existing installation, a new build or a refurbishment. In existing buildings other than private residential use with more than 20 parking spaces, Spanish regulations generally require one charging station for every 40 spaces or fraction thereof, up to 1,000 spaces, as well as specific requirements for certain public buildings. In new builds and certain refurbishments, ducting must also be provided to facilitate future expansion.
We design the installation to meet current requirements and leave the infrastructure ready to grow without redoing the entire electrical installation.
20+ SPACES
Existing non-residential buildings affected.
1 PER 40 SPACES
General provision up to 1,000 spaces.
AC or DC charging? Which suits your parking time
AC and DC charging
From extended charging to rapid charging, depending on dwell time and the needs of each installation.
Dynamic load balancing
Distributes the available power among the chargers without overloading the electrical installation.
OCPP connectivity
Integrates the chargers with management platforms and mobility services.
Access and billing
Manage users, tariffs, payments and usage rules from a single platform.
Remote monitoring
Monitor the status, consumption, alarms and operation of each charger in real time.
You do not always need more power. You need to manage it better.
Before sizing the chargers, we analyse the available power, the building’s consumption, the number of vehicles and how long they remain parked. From there, we define the power actually needed and how to share it among the different charge points. With dynamic load balancing, the installation can automatically adapt vehicle charging to the building’s consumption, making use of the available power and avoiding overloads. If future demand increases, we design the infrastructure to add new chargers and expand capacity without redoing the entire installation.
AVAILABLE POWER
We analyse before expanding.
DYNAMIC LOAD BALANCING
Power is shared according to demand.
SCALABILITY
Ready to add new chargers.
Experience demonstrated on site.
A selection of projects where we have provided engineering, equipment or installation in different settings.
Answers to your questions about your charging infrastructure.
How many chargers does my company need?
It depends on the number of vehicles, dwell times, turnover and expected growth. The demand study defines the right solution.
What is the difference between AC and DC charging?
AC charging is usual when the vehicle remains parked for hours. DC charging allows faster charging and requires more power.
Can I start with a few chargers and expand later?
Yes. We design ducting, switchboards and power to make future expansion easier.
Can users be identified and access restricted?
Yes. The platform lets you manage cards, apps, user groups and access rules.
Is it possible to charge for charging?
Yes. Tariffs, payment methods and billing can be configured according to the service model.
Can I control the chargers remotely?
Yes. Remote monitoring shows status, energy delivered, sessions, alerts and faults.
Do the chargers integrate with other platforms?
OCPP-compatible equipment can connect to management platforms and mobility services.
We design the charging infrastructure your project needs.
We analyse the number of parking spaces, the expected vehicles, parking times and the available power to define a charging solution adapted to the actual use of the installation. We can integrate AC or DC chargers, dynamic load balancing, user control, billing and remote monitoring, while leaving the infrastructure ready to grow as demand increases.
You do not need to know how many chargers or what power to install. We start by studying how the infrastructure will be used.
Somos una empresa B Corp
B Corp certification independently assesses a company’s environmental and social performance, transparency and legal accountability. For us, it is more than a label: it guides our technical decisions. Every plant we design is also assessed for its energy consumption, its contribution to reducing water use and its impact on the place where it operates.


